Hydropower Projects

S.No. Project Installed Capacity, MW
1. Yamuna Hydroelectric Project Stage-I (Dakpathar Barrage, Dhakrani, Dhalipur Power House) 84.75
2. Yamuna Hydroelectric Project Stage-II Part 1 (Ichari Dam and Chhibro Power House) 240
3. Yamuna Hydroelectric Project Stage-II Part-2 (Khodri Power House) 120

Is there any thermal power plant in Uttarakhand?

The Tapovan Vishnugad power plant is a 520MW run-of-river project being constructed on Dhauliganga River in Chamoli District of Uttarakhand, India. The plant is expected to generate approximately 2,558GWh of electricity per year.

Which dam is the main power source of Uttarakhand?

The Alaknanda hydroelectric project is a 330MW hydropower generating station developed on the Alaknanda River in Uttarakhand, India.

Which of the following project is in Uttarakhand?

The correct answer is Tehri Hydro Power Complex. Tehri Hydro Power Complex is in Uttarakhand.

Which company provides electricity in Uttarakhand?

Uttarakhand Power Corporation Limited
Uttarakhand Power Corporation Limited (UPCL): is the state power distribution utility.

Is Uttarakhand a power surplus state?

A. Uttaranchal is a power surplus state in the sense that even current levels of generation are in excess of demand. The state will endeavour to establish 24-hour power supply in all parts of the state at the earliest. B.

Who built Uttarakhand dam?

Tehri Hydro Power Project (4 units of 250 MW each). Construction and operation of dam & power house was taken up by Tehri Hydro Development Corporation (THDC) and was commissioned in 2006.

Who owns Tehri Dam?

THDC INDIA LIMITED
Phase 1 was completed in 2006. The Tehri Dam withholds a reservoir for irrigation, municipal water supply and the generation of 1,000 megawatts (1,300,000 hp) of hydroelectricity….

Tehri Dam
Construction began 1978
Opening date 2006
Construction cost US $2.5 billion
Owner(s) THDC INDIA LIMITED

Which department is responsible for hydropower in Uttarakhand?

After the creation of New State of Uttarakhand on November 9, 2000, Irrigation Department, Uttarakhand also constructed the Maneri Bhali Hydroelectric Project Stage-II, commissioned in Feb. 2008, and remained primarily responsible for maintenance of hydropower projects in the State up to April 2010.

What is hydro GMR Bajoli Holi?

Fuel Type: Hydro GMR Bajoli Holi currently under construction is going to be the group’s first hydro power project 180 MW run-of-the-river power facility being constructed on the River Ravi in the Chamba ISO 9001, ISO 14001 and OHSAS 18001 certifications from TUV NORD

What is the run-of-river hydroelectric project?

The run-of-river hydroelectric project is expected to reduce the northern grid’s dependence on fossil fuel to produce power. It included the construction of a 98m-tall concrete gravity diversion dam, a headrace tunnel, six intake tunnels, a desilting basin, a powerhouse, a tailrace channel, and a switchyard.

Where is Alaknanda hydro power plant located?

The Alaknanda hydroelectric power plant is located near Gaurshali Village, 10km from Shrinagar District of Uttarakhand. The run-of-river hydro project is expected to reduce the northern grid’s dependence on fossil fuel to produce power.